Skip to content
Back to projects

New Construction · Palmela · 2024

Casas da Quinta · CQ

A new build in Palmela, with the interior settled while the plan was still being drawn. Materials, joinery and lighting decided alongside the architecture.

Sala da moradia Casas da Quinta, em Palmela

We came in while the plan was still being drawn, which is the best moment for an interior project to start: ceiling heights, opening positions and light points can still be changed before anything is built.

Deciding with the architect, not after them

The joinery was designed at the same time as the walls that receive it, and the lighting was set before the services went into the ceiling. It is invisible work in the finished result, and it is what separates a house where everything lands from a house full of improvised junctions.

Gallery

Zona de estar da moradia Casas da Quinta
Hall de entrada da moradia Casas da Quinta

Have a project like this?

The site visit is free, and it is where we work out what is possible in your space.

Book a site visit